Need commercial roof restoration in Shiprock? Lapolla Industries provides free inspections, transparent pricing, and warranted spray foam solutions across NM.
For Shiprock commercial buildings with deteriorating but structurally sound roofs, Lapolla Industries delivers full restoration using spray foam to repair and insulate, followed by a silicone topcoat that provides 15 to 20 years of warranted waterproof protection. No tear-off, no business interruption.
In Shiprock, NM, the difference between a spray foam job that lasts and one that fails comes down to the contractor. Lapolla Industries applies the same quality standards to every commercial roof restoration project that earned us a reputation as one of the nation's most trusted SPF specialists — proper surface prep, correct foam thickness, and factory-specified coating application.
Every commercial roof restoration project we complete in Shiprock is backed by both manufacturer material warranties and our own workmanship guarantee. We document every step with photos and measurements, provide you with a detailed project report, and remain available for warranty service and maintenance throughout the life of your SPF system.
Our proven process ensures quality results on every spray foam project.
Every project begins with a thorough inspection of your property. We evaluate the existing condition, identify problem areas, and use infrared moisture scanning when needed to reveal hidden issues. You receive a detailed report with photos and honest recommendations.
Our preparation process includes substrate inspection, cleaning, moisture testing, and priming. We mask all areas not receiving foam, set up containment where needed, and verify that temperature and humidity conditions are within specification for application.
Using precision spray equipment, our crews apply the foam in controlled passes to achieve the specified thickness and density. The closed-cell foam expands 30 to 40 times its liquid volume, conforming to every detail of the surface and creating a seamless monolithic barrier.
After the foam cures, we apply a UV-protective coating — silicone, acrylic, or elastomeric — selected for your specific application and climate. We then remove all masking, clean up the work area, and conduct a final walkthrough with you to verify satisfaction.
Common questions about commercial roof restoration answered by our spray foam experts.
Costs for commercial roof restoration in Shiprock vary based on project size, existing conditions, and material requirements. We provide free on-site estimates with detailed written proposals. Contact us at {phone} for a no-obligation quote.
Spray foam delivers the highest R-value per inch, creates a seamless air and moisture barrier, conforms to any surface shape, and bonds permanently to the substrate. For commercial roof restoration applications, this combination of properties outperforms all conventional alternatives.
Yes. Every commercial roof restoration project in Shiprock is backed by manufacturer material warranties plus our own workmanship guarantee. We handle all warranty registration and remain available for warranty service throughout the life of your system.
Most residential commercial roof restoration projects in Shiprock are completed within 1 to 3 days. Larger commercial projects may take longer depending on square footage and complexity. We provide a detailed timeline with every estimate.
See what customers across the country say about working with Lapolla Industries.
"Had spray foam applied to our crawl space walls and rim joists. The difference in floor temperature upstairs is dramatic. Our furnace cycles less and the energy savings paid for the project faster than they estimated."
"Lapolla Industries installed a spray foam roof on our warehouse last spring. Their crew was thorough, professional, and finished ahead of schedule. The building stays cooler in summer and the roof looks pristine a year later."
"They waterproofed our entire flat roof with a seamless elastomeric membrane. Two years later and not a single drop of water has gotten through. The application was clean and fast — three days for 8,000 square feet."